A CMS or framework replacement can preserve URLs while changing rendering and metadata. A domain move also needs control of the old and new properties, DNS, certificates and redirects. A redesign that changes navigation can disrupt discovery even when addresses stay the same. We inventory the intended changes and agree who owns infrastructure, content approval, tracking and launch authorization. Avoid combining unnecessary changes when they would make failures harder to diagnose. The business should have a clear understanding of who implements each component before the launch date is fixed.
- Identify platform, domain, protocol and URL changes separately
- Record launch constraints and third-party dependencies
- Assign approval and escalation owners
Combine the existing crawl, sitemap, important landing pages and available backlink or traffic records into an old-URL inventory. Map each retained URL to the closest useful destination. Permanent moves generally require server-side 301 or 308 redirects directly to the final URL. Keep intentional removals explicit; a missing page without a relevant replacement should not be redirected indiscriminately to the homepage. Redirects, internal links, canonicals and sitemap URLs need to agree. The business should retain ownership of the old domain and redirect infrastructure until the new property is fully validated.
- Record retained, redirected and intentionally removed URLs
- Test chains, loops, query handling and destination relevance
- Keep the old domain and redirect infrastructure under owned control
We compare representative new pages with the approved inventory and inspect initial HTML, canonicals, robots directives, structured data and navigation. Protect staging with access controls where practical; robots.txt alone does not reliably prevent indexing. Production must not inherit staging access restrictions or accidental noindex directives. Form delivery and consent-aware tracking need their own acceptance tests so traffic changes are not confused with measurement failures. The business should verify that staging does not accidentally block production indexing.
- Crawl permitted staging paths and compare page templates
- Verify production hostnames and launch-time directive changes
- Test enquiry delivery and analytics separately
After an authorized deployment, check priority old URLs, final destinations, status codes, TLS, canonical tags and rendered content. Validate internal links and the new sitemap, then submit the sitemap through the appropriate Search Console property. For an eligible domain move, review Google's Change of Address requirements; it is not a substitute for redirects and is not used for every platform-only change. Record results against the launch checklist instead of assuming a successful build means a successful migration. The business should have a tested rollback plan ready.
- Check critical templates and conversions on the live host
- Confirm redirects reach the intended final 200-status pages
- Log failures, owners and the launch decision
Agree a monitoring period and cadence for crawl errors, indexing reports, selected canonicals, traffic segments and qualified enquiries. Search Console reports can lag, and ranking fluctuation alone is not a reliable rollback trigger. Before launch, define actionable failures such as widespread server errors or a broken enquiry journey, plus who can authorize recovery. Preserve tested backups and release versions, and account for new orders or content before restoring data. DNS caches and search recrawling mean rollback is not instantaneous. The business should know who can authorize recovery and what the recovery procedure is.
- Compare like-for-like periods and annotate the migration
- Keep redirects and old-domain ownership beyond launch
- Escalate confirmed failures using agreed recovery criteria
Through the contact link below, share the current website, proposed platform or domain, approximate URL count and planned launch date. Deliverables can include the URL inventory and mapping sheet, staging issue log, go/no-go checklist, launch validation record and monitoring handover. The scope identifies who implements redirects, manages hosting and provides out-of-hours coverage. Platform development, DNS administration, content rewriting and extended monitoring are not automatically included. The business retains ownership of all accounts and content.
- Share the migration brief without credentials
- Agree deliverables, dependencies and exclusions
- Request a consultation before the launch date is fixed